George Roberts - Please click here to return to the homepage

Specialist Scaffolding Supplier

Call us for a competitive quote 0151 524 2434

Open an Account

Job: Sizergh Castle

The contract to weather protect completely this grade 1 listed castle in Cumbria required some 1,200 square metres of temporary roofing system to enable the complete refurbishment and replacement of the existing roof.


The system chosen was the Ubix Temporary Roof System.


With a contract length in excess of 12 months, the temporary roof more than coped with all the weather conditions and the contract was completed without major problems occurring.

 

Email: sales@scaffoldingsales.co.uk

Tel: +44 (0) 151 524 2434